For the period 2023-2025, Sament Group continued with the realization of systems for natural smoke and heat extraction in the event of a fire in production and logistics buildings in Iceland.

All systems are combined, for ventilation and natural lighting with high levels of thermal insulation. A specific point in the construction of natural lighting and smoke extraction systems is the requirement for a high level of wind resistance with levels of WL 3000 N and more, taking into account the specifics of the country.